Submit A Motion Owner Motions Template Please fill out the owner details and select a motion template to complete. Be sure to enter as much information as possible and your request will be submit to the Body Corporate Committee for their consideration. To minimise delays, please attached supporting documentation to assist your application such as proposals / quotes, plans, specifications and any relevant approvals.Body Corporate Name(Required)Body Corporate Address(Required)Lot Number(Required)Applicant Name(Required)Applicant Email Address(Required)Owner Motion TemplatesEngagement Of ContractorLot Improvement RequestAir Conditioner RequestAntenna Installation RequestHard Flooring RequestPet RequestSignage RequestSolar Panel RequestSecurity/fly Screen/s RequestAwning RequestOtherSubmitted by Owner: THAT the Body Corporate approve to engage , – Quotation No. for a total of inclusive of GST to complete the as per the job specifications detailed in the attached quotation. Costs are to be drawn from the Body Corporate Select Administration or Sinking FundAdministration FundSinking FundThis field is hidden when viewing the formContractor CompanyThis field is hidden when viewing the formContractor Company AddressThis field is hidden when viewing the formContractor Quote NoThis field is hidden when viewing the formContractor Quote PriceThis field is hidden when viewing the formContractor Works DescriptionThis field is hidden when viewing the formContractor Funds Drawn FromLot Improvement Request Submitted by Owner: THAT the Body Corporate approve for the Owner of Lot to install within the Lot subject to the following conditions: That the improvement and its installation is the full responsibility of the Lot Owner including all costs; That all future repairs and maintenance on the improvement and its supporting fixtures and fittings are to remain the full responsibility of the Lot Owner; That a suitably qualified contractor be engaged to complete the installation; That should any common property be damaged during the installation or during future maintenance, the Lot Owner is responsible to rectify the damage; Should the improvement disrupt the peaceful enjoyment of another Lot at the complex, it is to be removed at the cost of the Lot Owner; Should the improvement breach any of the Body Corporate By-Laws, it is to be removed at the cost of the Lot Owner; The improvement and its installation are to meet all Work Health and Safety and City Council regulations (if applicable). This field is hidden when viewing the formDescription of the improvement requestAir Conditioner Request Submitted by Owner: THAT the Body Corporate approve the Owner of Lot to install Air-Conditioner to the of the lot as per the following conditions; That the Air-Conditioning unit installation is the full responsibility of the Lot Owner including all costs; That all future repairs and maintenance on the unit and supporting equipment i.e. condensation drain remain the full responsibility of the Lot Owner; That a suitably qualified contractor be engaged to install the unit; That should any common property be damaged during the installation or during future maintenance of the unit the Lot Owner is responsible to rectify the damage; Should the Air-Conditioning unit disrupt the peaceful enjoyment of another lot at the complex the unit be removed at the cost of the Lot Owner; Should the Air-Conditioning unit breach any of the Body Corporate By-Laws the unit be removed at the cost of the Lot Owner; The Air-Conditioning unit is to meet all Work Health and Safety and City Council regulations as to noise emission and distances from boundaries; and That the Air-Conditioning condensation drain to be plumbed to the nearest storm water drain.This field is hidden when viewing the formAir Conditioner DetailsThis field is hidden when viewing the formAir Conditioner LocationAntenna Installation Request Submitted by Owner: THAT the Body Corporate approve the Owner of Lot to install a antenna to the roof. Subject to the following conditions; That the installation of the antenna is the full responsibility of the Lot Owner including all costs; That all future repairs and maintenance on the antenna and supporting equipment remains the full responsibility of the Lot Owner; That a suitably qualified contractor be engaged to install the antenna; That should any common property be damaged during the installation or during future maintenance of the antenna the Lot Owner is responsible to rectify the damage; Should the antenna disrupt the peaceful enjoyment of another lot at the complex the antenna be removed at the cost of the lot Owner; Should the antenna breach any of the Body Corporate by-laws the antenna be removed at the cost of the lot Owner; The antenna is to meet all Work Health and Safety and City Council guidelines.This field is hidden when viewing the formAntenna DetailsHard Flooring RequestSubmitted by Owner: THAT the Body Corporate approve the Owner of Lot to install flooring to the of the Lot on the following conditions- Upon completion of the works, the floor shall be tested to ensure that, unless otherwise specified in the Body Corporate by-laws, the minimum FIIC requirement has been met; Any test certificate must be submitted to the Body Corporate Committee within 10 days of the test, showing compliance with the defined limit; Where the FIIC of the completed work is lower (i.e. lower performance) than that described the owner must, within a reasonable time and at its own cost, either remove the flooring or undertake any necessary procedures/additional work to ensure compliance with the Body Corporate Committee requirements. All the provisions of this By-law will once again apply; That the flooring installation is the full responsibility of the Lot Owner including all costs; That all future repairs and maintenance on the flooring and supporting equipment i.e. underlay remain the full responsibility of the Lot Owner; That a suitably qualified contractor be engaged to install the flooring; That should any common property be damaged during the installation or during future maintenance of the flooring the Lot Owner is responsible to rectify the damage; That all works must be completed between 8:00am to 4:00pm Monday to Friday, excluding Public Holidays; The owner is to liaise with the onsite Building Managers (where applicable) to discuss access to the scheme by the owners contractors and discuss any other requirements of the Building; and The Lot Owner is responsible for the removal of all trade waste and materials from scheme land. No waste is to be left on the property, including in shared bins located on common property.This field is hidden when viewing the formFlooring Request TypeThis field is hidden when viewing the formFlooring Request LocationPet Request Submitted by Owner: THAT the Body Corporate approve the Owner of Lot to house a (, ) within the Lot subject to the following conditions- That the is to be council registered (if applicable); That the is to be leashed or caged at all times when on common property; That the is to be carried over common property when not leashed or caged; That should any common property be damaged by the animal the Lot Owner is responsible to rectify the damage; Should the disrupt the peaceful enjoyment of another lot at the complex the animal be removed at the cost of the Lot Owner; Should the breach any of the Body Corporate By-Laws the animal be removed at the cost of the Lot Owner; That the approval is only for the life of this specific animal. This field is hidden when viewing the formPet TypeThis field is hidden when viewing the formPet BreedThis field is hidden when viewing the formPet SizeSignage Request Submitted by Owner: THAT the Body Corporate approve the Owner of Lot to install the following signage to the lot at the complex- (a) – ; AND THAT the installations be approved on the following conditions- That the installation of the signage is the full responsibility of the Lot Owner including all costs; That all future repairs and maintenance on the signage and supporting equipment remain the full responsibility of the Lot Owner; That a suitably qualified contractor be engaged to install the signage; That should any common property be damaged during the installation or during future maintenance of the signage the Lot Owner is responsible to rectify the damage; Should the signage disrupt the peaceful enjoyment of another lot at the complex the unit be removed at the cost of the Lot Owner; Should the signage breach any of the Body Corporate By-Laws it is to be removed at the cost of the Lot Owner; The signage is to meet all Work Health and Safety and City Council guidelines.This field is hidden when viewing the formSignage DetailsThis field is hidden when viewing the formSignage LocationThis field is hidden when viewing the formSignage SizeSolar Panel Request Submitted by Owner: THAT the Body Corporate approve the owner of Lot to install roof mounted solar panels to the subject to the following conditions; 1. The solar panels and ancillaries are to be: Situated on the roof above the Lot and within the boundaries of the Lot. Positioned in such a way as not to cause glare which will effect in any way another unit or common property. Installed parallel with the roof pitch, as close as practical to the existing roof sheeting (not to exceed 100mm) and taking reference to Clause b above. Installed with all ancillary items and equipment within the bounds of the respective Lot. Installed by a professional solar panel installer with all costs of installation, repairs and on-going maintenance to be borne by the Lot Owner. The Lot Owner will be responsible for all costs for the installation, ongoing regular maintenance and repairs of the panels. The Lot Owner will be responsible for all repair costs should common property be damaged during the installation of the panels. That should the Body Corporate elect to carryout maintenance or remedial works to the common property building structure, upon written request from the Body Corporate the Lot Owner will remove and replace the solar panels and ancillaries at the Lot Owner expense. The Lot Owner will make good all common property structures to its original condition upon removal of the solar panels and ancillaries. This field is hidden when viewing the formSolar Panel NumberThis field is hidden when viewing the formSolar Panel WeightThis field is hidden when viewing the formSolar Panel Mounting LocationSecurity/fly Screen/s Request Submitted by Owner: THAT the Body Corporate approve the Owner of Lot to install Select Screen TypeFly ScreenSecurity Screen to be attached to the . Subject to the following conditions- That the screen/s installation is the full responsibility of the Lot Owner including all costs; That all future repairs and maintenance on the screen/s and supporting equipment remain the full responsibility of the Lot Owner; That a suitably qualified contractor be engaged to install the screen/s; That should any common property be damaged during the installation or during future maintenance of the screen/s the Lot Owner is responsible to rectify the damage; Should the screen/s disrupt the peaceful enjoyment of another lot at the complex the screen/s must be rectified to comply with the Committee’s approval or removed at the cost of the Lot Owner; Should the screen/s breach any of the Body Corporate By-Laws the screen/s must be rectified to comply with the Committee’s approval or removed at the cost of the Lot Owner; The screen/s is to meet all Work Health & Safety and City Council guidelines. That the screen/s is approved on the basis of the detailed specifications outlined in the request/plans. That the screen/s must be maintained in good condition at all times.This field is hidden when viewing the formScreen TypeThis field is hidden when viewing the formScreen DetailsPlease provide details about where the screen/s will be attached.Awning Request Submitted by Owner: THAT the Body Corporate approve the Owner of Lot to install Awning/s to be attached to the dwelling approximately Subject to the following conditions- That the awning/s installation is the full responsibility of the Lot Owner including all costs; That all future repairs and maintenance on the awning/s and supporting equipment remain the full responsibility of the Lot Owner; That a suitably qualified contractor be engaged to install the awning/s; That should any common property be damaged during the installation or during future maintenance of the awning/s the Lot Owner is responsible to rectify the damage; Should the awning/s disrupt the peaceful enjoyment of another lot at the complex the awnings must be rectified to comply with the Committee’s approval or removed at the cost of the Lot Owner; Should the awning/s disrupt the peaceful enjoyment of another lot at the complex the awnings must be rectified to comply with the Committee’s approval or removed at the cost of the Lot Owner; Should the awning/s breach any of the Body Corporate By-Laws the awnings must be rectified to comply with the Committee’s approval or removed at the cost of the Lot Owner; The awning/s is to meet all Work Health & Safety and City Council guidelines. That the awning/s is approved on the basis of the detailed specifications outlined in the request/plans. That the awning/s must be maintained in good condition at all times.This field is hidden when viewing the formAwning TypeThis field is hidden when viewing the formAwning DetailsPlease provide details about where the awing/s will be attached.Other Request Submitted by Owner: You may submit a request motion below. Please note if you are not using a template you must ensure that the motion meets the appriopriate critera so that it is not Ruled Out Order at the Annual General Meeting. Other Request Motion(Required)Signature